SYNCHRONIZING PANEL – GENERATORS & TRANSFORMERS 

Safe – Intelligent – Continuous Power Distribution Solution

What is a Synchronizing Panel?

A Synchronizing Panel is a specialized electrical assembly designed to connect and control the synchronization of power from multiple generators or transformers. The system ensures perfect alignment in phase, frequency, and voltage, enabling optimized load sharing, stable operation, and system safety.

Common Synchronization Configurations 

Synchronization of Two or Multiple Generators

→  Automatically starts and shares loads among generators during utility grid outages.

→ Highly suited for large-scale backup power systems.

Transformer-to-Transformer Synchronization 

→  Applied in 22/0.4kV or 35/0.4kV substations equipped with two or more transformers.

→ Enables parallel operation for efficient load sharing and prevents localized overloading.

→  Requires precise synchronization of voltage, frequency, phase angle, and phase sequence.

→  Automatically isolates the synchronization in the event of load imbalance faults.

Generator-to-Transformer Synchronization 

→ Applied to transformer and generator systems during scheduled utility grid power outages.

→ Ensures exact phase alignment and timing before grid disconnection; seamlessly transfers loads to the generator and trips the transformer circuit when current consumption reaches its minimum.

→ Commonly utilized in power supply systems for manufacturing plants or power stations with dedicated generator sets.

→ Integrates critical protection features against reverse power, loss of synchronization, and overcurrent.

Outstanding Benefits 

  • Maintains internal power stability during utility grid outages.
  • Ensures proportional load sharing among power sources and generators, maximizing system efficiency.
  • Delivers comprehensive automation for effortless operation and real-time monitoring.
  • Integrates seamlessly with SCADA, HMI, or remote monitoring systems. 
  • Guarantees absolute safety with fully integrated protection and alarm functions. 

Customized Solutions per System Configuration

ApplicationSuitable Synchronization Solution
2 backup generatorsGenerator synchronizing panel – automatic load sharing
Parallel substation with 2 transformersTransformer synchronizing panel – monitoring & load sharing
Generator grid-tied systemGenerator & transformer synchronization – grid-tied generation
Hệ thống hybrid (NLMT + Gen)Renewable energy synchronization – grid stabilizationh lưới





Typical Technical Specifications

SpecificationValue
Synchronization TypeGenerator – Transformer – Grid-tied
Supported Power Sources2 – 6 sources
Voltage Range0.4kV – 22kV
Frequency50Hz (Adjustable)
Control ModeAutomatic / Integrated monitoring
Communication ProtocolsModbus RTU / TCP / OPC UA





Integration Options

  • Integration of solar power systems, inverters, and BESS
  • ATS (Automatic Transfer Switch) connectivity
  • Remote control via SCADA, Web, or Mobile platforms
  • Connectivity and coordination for Microgrid systems


ADEC – Your Trusted Partner

We design and provide customized synchronization solutions tailored to your unique requirements:

  • Generator Synchronizing Panels
  • Transformer Synchronizing Panels
  • Grid-Tied Power Generation Solutions
  • Station-Wide SCADA/HMI Integration Solutions